Project Description

The project includes the installation of a new pipe system which will increase the capacity of the drainage system in the area. The upgraded system will be capable of receiving the offsite water flow and routing the majority of the flow (approximately 80-94%) directly to the proposed outfall at Marsh Creek. The pipes range in size from 42” to 60” and will run south along the east side of Glenridge Drive then east under the southern travel lane of Mabry Road. The system continues east along Mabry Road and outfalls directly into Marsh Creek upstream of the current existing outfall.

Project Status
August 2017: Construction bids are currently being reviewed by staff. 