Status: Design contract award approved by MCC on 12/5. Contract executed 1/4/2024.
Public Engagement:
The City of Sandy Springs and the Perimeter Community Improvement District (PCID) held a public open house regarding the Peachtree Dunwoody Road Multi-Use Trail, providing the community with the opportunity to provide input on the proposed path.
Comments were accepted through Thursday, August 29, 2024.
Public Meeting Materials:
Background: The goal of the project is to improve bicycle and pedestrian facilities between Hammond Drive and Mt. Vernon Highway. The Project consists of the design, right-of-way acquisition, utility coordination and construction of a twelve (12) foot wide bicycle/pedestrian side path with a six (6) foot wide landscape buffer and a minimum of one (1) foot back of path buffer on the west side of Peachtree Dunwoody Road from Hammond Drive to Mt. Vernon Highway. This will tie to the Peachtree Dunwoody Lake Hearn Connectivity Improvements Project (Project No. T-2208), as well as to the Mt. Vernon Highway Corridor Improvements Project (Project No. TS-192).