620 Morgan Falls Road, Sandy Springs, GA 30328
MapThe new Sandy Springs Police Department Headquarters and Municipal Court will be located at 620 Morgan Falls Road. The property totals 7.42 acres and currently consists of a single four-story office building and parking lot. The building is a brick and glass veneer and steel-frame structure containing a total of 106,678 square feet of space The building was built in 1990 and has been through one significant remodel.
The current design square footage for the Sandy Springs Police Department Headquarters and Municipal Court is 130,542, with 23,864 square feet of additional space to the existing building.
Sally Port Addition (external to the building) – 8,484 sq. ft.
(Project Completion March 2025)
Roof:
3rd Floor:
2nd Floor:
1st Floor:
Basement:
Exterior:
Roof:
3rd Floor:
2nd Floor:
1st Floor:
Basement:
Exterior:
October 21, 2024
September 9, 2024
Weekly Report January 8, 2024 (PDF)
Weekly Report January 1, 2024 (PDF)
Weekly Report December 25, 2023 (PDF)
Weekly Report December 18, 2023 (PDF)
Weekly Report December 11, 2023 (PDF)
Weekly Report December 4, 2023 (PDF)
Weekly Report November 27, 2023 (PDF)
Weekly Report November 13, 2023 (PDF)
Weekly Report November 6, 2023 (PDF)
Weekly Report October 30, 2023 (PDF)
Weekly Report October 23, 2023 (PDF)
Weekly Report October 16, 2023 (PDF)
Weekly Report October 9, 2023 (PDF)
Weekly Report October 2, 2023 (PDF)
Weekly Report September 25, 2023 (PDF)
Weekly Report September 18, 2023 (PDF)
During the City Council Meeting, City Council approved a variance allowing alternative fence height and materials.
Agenda Item: Request for Mayor and City Council Consideration to approve a Variance from City Development Code Section 8.2.2. Parking Lot Landscaping, 8.2.7. District Boundary Buffer Wall and 8.2.10. to Allow Alternative Fence Height and Materials, Associated with the Development of the Municipal Complex.
During the Public Facilities Authority Special Called Meeting Council approved the final design for the combined Police Headquarters, Municipal Court and Feet Maintenance Building/Site project and guaranteed maximum total project pricing $45,188,432.
Agenda Item: Request for Public Facilities Authority Consideration to Approve the Guaranteed Maximum Pricing for the Police Headquarters and Municipal Courthouse Project at 620 Morgan Falls Road and to Authorize the General Manager to Execute the Change Order to the Contract
During a Public Facilities Authority Special Called Meeting, the design development pricing for the project was approved in the amount of $50,718,125.00, and directed that design and pricing be continued to obtain GMP for the Project.
Agenda Item: Request for Public Facilities Authority Consideration to Authorize the Design Development Pricing for the Police Headquarters and Municipal Courthouse Project at 620 Morgan Falls Road, and Authorizing the General Manager to Continue the Project Design to Obtain Guaranteed Maximum Pricing for the Project, and to Move Forward with Early Release of Trades of Long Lead Time Materials
During the Public Facilities Authority Special Called Meeting, City Council approved schematic design pricing for the project in the amount of $50,532,282.00 and the continuation of design to attain Guaranteed Maximum Pricing for the Project.
Public Facilities Authority Special Called Meeting
Request for Public Facilities Authority Consideration to Approve the Schematic Design Pricing for the Police Headquarters and Municipal Courthouse Project at 620 Morgan Falls Road (Project), and to Authorize the General Manager to Continue Design to Obtain Guaranteed Maximum Pricing for the Project
The Public Facility Authority adopted a resolution approving a Contract in the amount of $985,026.00 plus 2.75% of construction cost for Construction Services between the City of Sandy Springs and Reeves Young, LLC for construction of the Police Headquarters and Municipal Courthouse.
Agenda Item: Request for Public Facilities Authority Consideration of a Resolution to Approve a Contract with Reeves Young, LLC for the Construction Manager at Risk for the Public Safety Building and Authorization for the General Manager to Execute the Contract
The City issued a purchase order to Jericho in the amount of $1,035,400.00 for design services. The design scope included considerations of new mechanical, electrical, and plumbing systems, and fire protection, where applicable. In addition, upgrades as required for Americans with Disabilities Act (ADA) compliance, current building codes, including the International Building Code, NFPA 101, and Georgia Peach Green Building Rating System were to be incorporated into the design plan. Compliance with energy efficiency and sustainable construction standards were also design imperatives.
The City conducted a procurement to identify and select a qualified construction manager at risk to construct the Project according to the design plan developed by Jericho.